中国人妻一区二区三区精品,国产精品一区乱码在线观看,亚洲理论在线a中文字幕,精品国产女主播在线观看

Your Position: Home > Support > Service Center

Notes for reuse of Lyboa pump of ZYD transformer oil filter

2019/8/1??????view:

  The pump must be stored in a dry place before it returns to the workplace again. Better at room temperature (200C). Before the pump is withdrawn from the workplace, it should be removed from the vacuum system, washed with dry nitrogen and replaced with oil. The inlet and outlet of the pump must be sealed with the shipping seals at the time of delivery. The gas town must be closed. If the pump is idle for a long time, it should be sealed with plastic bags and desiccant.

  If the pump has been idle for more than a year, it must be maintained in a standard way and oil must be changed before the pump is put into operation again. We recommend that you contact the LEYBOLD manufacturer for maintenance services.

  Standard pumps are not suitable for installation in explosive dangerous areas. Please contact us when you intend to apply this method. Before installing the pump, it must be reliably disconnected from the power supply in order to prevent accidental start-up of the pump. Pumps can only be installed by qualified and well trained personnel. All safety regulations should be observed.

  Installation of ZYD oil filter Lyboa pump for reuse:

  In order to ensure safe start-up, it is necessary to proceed step by step according to the following instructions.

  The start-up can only be carried out by trained full-time personnel.

  SOGEVAC can be installed on any flat, horizontal plane. Under the four legs, there are metric threaded holes for fixing pumps.

  If the pump is inclined, the oil level can not be correctly read out. The pump is in danger of running dry.

  According to the different use of oil, the ambient temperature of the pump should be between 12 (55) and 40 (104). By improving the pump or replacing different types of oil, the pump can operate at lower ambient temperature. Please consult us about these questions.

  In order to ensure a good cooling of the pump, there should be enough space in the intake and exhaust outlets for maintenance and repair. Make sure the motor air intake is clean and clean.

  1. Connect to the system

  Standard pumps are not suitable for installation in explosive dangerous areas. When you plan to do so, please consult us. Before installing the pump, it must be reliably cut off from the power supply to prevent unintentional starting of the pump. The pump can only be installed by qualified and trained professionals.

  Comply with all safety regulations.

  2. Inlet side

  The intake flange of the pump is connected by internal threads. The pump can be connected to the vacuum system with suitable connectors.

  The cross section of the intake pipe should be at least the same as that of the intake port. If the intake pipe diameter is too small, the pumping speed will be reduced.

  We recommend using LOCTITE or TEFLON tape for threaded joints to ensure vacuum sealing. (especially when dangerous gases)

  3. Installation Warning of ZYD Oil Filter Lyboa Pump

  The pump should be connected to the intake pipe without any stress. Hose or pipe fittings are used in intake and exhaust pipes for easy removal during pump maintenance.

  - The maximum import pressure shall not exceed atmospheric pressure (about 1013 mbar). When there is excessive pressure in the import, the pump shall not be started.

  - The type of material used in the installation of pipes should take into account the type of gas pumped. The same is true for seals.

  If the process gas contains dust, dust filters must be installed in addition to random dust filters. We recommend that dust filters be installed horizontally with tees (3/13) or elbows (3/14). This ensures that no dust particles fall into the intake when the filter is removed. Import filters with different filter elements. Metal filter can prevent solid particles such as paper and plastics from entering the pump; paper filter can remove small particles such as dust and powder less than 1 micron; activated carbon filter can absorb chemical vapor such as acid and solvent. If the activated carbon filter is stored in a humid place, it should be dried at 212 for 2 hours before use.

  When extracting steam, we recommend installing condensers at the inlet and outlet sides.

  When pumping dangerous gas, the intake pipe must be tight.

  Solid particles or liquids are never allowed to enter the pump.


精品久久只有精品做人人| 亚洲大尺度av免费观看| 欧美精品福利片在线播放| 99久久精品费精品视频| 在线播放韩国A级无码片| 女版壮志凌云成版在线播| 亚洲av午夜电影在线观看| 日韩区二区三区在线观看| 久久久精品影院观看地址| 中文字幕一精品亚洲无线一区| 两个人免费完整版在线观看视频| 久久久久精品国产亚洲a| 久久久久久99999黄色| 骚妇视频在线观看,。。| 国产男女无套?在线播放| 国产精品夜夜春夜夜爽久久小| 国产亚洲一区二区三区在线| 日韩精品人妻系列无码av东京| 日日摸夜夜爽天天草天天干| av片在线观看| 性欧美精品视频在线播放| 久久久久久久久久性生活| 久久久久综合国产精品二区| 第一次尝试黑人在线播放| 国产精品中文字幕久久久| 黄色一级一区二区中文字幕| 国产精品三级不卡在线观看| 亚洲h动漫在线| 久久婷婷五月综合色精品| 久久综合九色欧美综合狠狠| 久久天天躁狠狠躁夜夜婷| 色婷婷久久亚洲综合看片| 男人去天堂在a线在线观看| 国产精品国产三级区别第一集| 激情亚洲另类图片区小说区| 夜夜澡天天碰人人爱AV| 国内精品视频一区二区三区八戒 | 国产免费a∨片在线播放| 久久 午夜福利 张柏芝| 97超碰人人爱香蕉精品| 日本高清视频一区在线观看|